TECHNICAL RESOURCES
PCE believes that information received for engine installation, break-in, and aftercare following an overhaul or repair is as important as the engine work performed. Frequent flight, proper operation, and routine maintenance are all key components of engine longevity. This page is dedicated to supplying you with the most up to date information available for the care and feeding of your engine.
Click on a link below to view the related document. If you don’t see the information you need, just email or call us.
QUICK LINKS
CONTINENTAL
- Breather Pressures
- Cross Flow Cylinder Inspection
- Cylinder Compression & Borescope
- EGT Recommendations
- Fuel Injection System Application Guide
- Fuel System Adjustment
- Magneto Timing
- M-0 Standard Practice & Maintenance Manual
- Oil Gauge Rod Application
- Operation After Cylinder or Engine Change
- Preservation
- Propeller Seal Replacement
- Propeller Strike Inspection
- Recommended Sealants
- TCM Connecting Rods SI05-9
- Throttle Mixture Arms
- Torque Limits
LYCOMING
- Approved Cylinders & Related Parts
- Crankshaft Seal Replacement
- Dual Magneto Capacitor
- Key Reprints Flyer
- Leaning
- Lubricant Recommendations
- Lycoming Cylinder Application
- Magneto Timing
- Mandatory Parts Replacement
- Numerical Parts History
- Pre-Oil
- Preservation
- Propeller Strike Inspection
- Service Literature Index
- Table Limits & Torque Value